Internal and External decoration works to 4No Timber Cabins positioned in the surrounding gardens of a care home based in Warwickshire. The cabins were built to allow familes and friends visit their loved ones, in a safe and secure envrionment.
Due to Covid-19 the team had no access to the internal areas at any time during the decoration project. Along with the autumnal/winter weather, the teams drying times were affected as a result. Therefore they had to apply a coat at a time inside each cabin and allow to dry fully before second and third coats.
KEY FACTS:
Client: WCS Care Group Ltd
Contract Sum: £10k
Contract Period: 7 Weeks
Contract Dates: Sept 2020 - Nov 2020
Form of Contract: JCT Intermediate Contact