Solar PV installation to a live building within tight timescales
Seddon was directly awarded works through the Pagabo Decarbonisation Framework, to decarbonise Oak Park Active Living Centre, achieving compliance with the Walsall Council’s carbon reduction agenda.It features a gym with equipment, a 25-metre pool and teaching pool, sports courts, a sauna and steam room, and coffee shop facilities.
Part of Seddon’s work involved installing a 387kWp solar PV system, as well as electrical work to support the new installation, an earthing and bonding system, and lightning protection due to the placement. The aim was to reduce demand for national grid supplied electricity, lowering Scope 2 emissions on the site.
Funding for the project came through Salix Decarbonisation Grant Funding, with time limited to 31st March 2025. Therefore, the start date was listed as ASAP, and it was key to try and understand the project and what was required straight away.
Pre-construction
To mitigate the risk of over-exporting energy to the grid, we implemented an export control system that limited export levels.
The project was designed up to RIBA Stage 4, with Seddon then commencing building and construction works based on the plans.
We had to develop an edge protection strategy for the installation and future maintenance to prevent roof penetrations. The solution was a handrail clamped to the seams of the roof.
Summary of works
The project was carried out in a live environment which required careful coordination to ensure ongoing operations were not disrupted. The project involved a requirement for 6-metre-high Haki towers with Heras fencing around the scaffolding to control access. The roof spans over three areas—Roof A, Roof B, and Roof C—with scaffold loading bays positioned accordingly.
Outcomes & Benefits
The programme of works carried on throughout winter, however we mitigated any weather delays and were able to handover the project on time and within budget. Consequently, the council were able to meet the funding deadline and received their funding in full.
Walsall Council were pleased with the quality of work within the tight timescales and we are now in discussion for another PV install.